Well very successful day today. Started at 8am and finished cleaning everything up by 7pm. I think we successfully did enough environmental destruction for the whole Org today with brake fluid and such
All we got done on my bike:
- Vortex front and Supersprox rear sprockets
- EK ZZZ chain installed
- Galfer front rear and clutch stainless lines (I had goodrige brake lines but if i was buying galfer for the clutch, everything has to be the same... OCD )
- Installed Rear brake reservoir that eliminates the one in the tail
- New eBay Ceramic Brake Pads https://www.hayabusa.org/forum/gene...s/145809-chinese-ceramic-brake-pads-ebay.html
- Pirelli Angel ST Rear tire put on (Front next weekend, not enough time)
- Replaced my two short stacks with long ones in the air box
Cleaned the bike up a bit. We still have to do stuff to Shawn's bike next weekend
All we got done on my bike:
- Vortex front and Supersprox rear sprockets
- EK ZZZ chain installed
- Galfer front rear and clutch stainless lines (I had goodrige brake lines but if i was buying galfer for the clutch, everything has to be the same... OCD )
- Installed Rear brake reservoir that eliminates the one in the tail
- New eBay Ceramic Brake Pads https://www.hayabusa.org/forum/gene...s/145809-chinese-ceramic-brake-pads-ebay.html
- Pirelli Angel ST Rear tire put on (Front next weekend, not enough time)
- Replaced my two short stacks with long ones in the air box
Cleaned the bike up a bit. We still have to do stuff to Shawn's bike next weekend