Powdercoat project part 3 03' Blk/grey

How long did it take to put back together?
I started at 9pm friday night .. stopped around 2:30am called it a day .. (frame/swingarm together, front end reattached, motor bolted in).

Saturday started around 11am worked on it till 12am .. took a total of 4 hrs of breaks. (Had to drop motor again, put motor back in, took care of all wiring, re-do the triple clamp, went to chuck-e cheese for a b-day party, came back took care of the rear brakes, sub frame, more wiring spagetti, exhaust, radiator, TB, intake, test run.)

Sunday started at 10am - 12 noon .. (finished test run, replace all body work, washed bike, took pictures, got ready for work left for work at 12:30)

around 17 hrs total.. saved me some labor.. 17hrs @ $75hr= $1275.00 and i know that a shop would charge more.
 
Sweet lookin ride!!!!!!!!
cool.gif
cool.gif


cool.gif
 
A couple more.

Before: After shots

Imagestation.com closed, link removed

Imagestation.com closed, link removed
 
Man I love the black frame, and black rear sets. Looks like my 04LE. I even painted my little gray plugs on the frame flat black. I've got the BDE carbon can. I'm getting ready to powder coat my rear sets, and rear peg holders. Awesome bike. A+++++++++++++.
 
Back
Top