How long did it take to put back together?
I started at 9pm friday night .. stopped around 2:30am called it a day .. (frame/swingarm together, front end reattached, motor bolted in).
Saturday started around 11am worked on it till 12am .. took a total of 4 hrs of breaks. (Had to drop motor again, put motor back in, took care of all wiring, re-do the triple clamp, went to chuck-e cheese for a b-day party, came back took care of the rear brakes, sub frame, more wiring spagetti, exhaust, radiator, TB, intake, test run.)
Sunday started at 10am - 12 noon .. (finished test run, replace all body work, washed bike, took pictures, got ready for work left for work at 12:30)
around 17 hrs total.. saved me some labor.. 17hrs @ $75hr= $1275.00 and i know that a shop would charge more.