Back from my 2nd test ride
Here's the plan for
<span style='font-size:17pt;line-height:100%'><span style='color:red'>Sunday June 11th</span></span>ride!!!
The ride offically starts at the IHOP in Redlands(1630 Industrial Park Ave Redlands, CA 92374), meeting at 8:30am and rolling at 9:00am. From the I-10 exit on Alabama, turn south, then turn right onto Industrial Park AVE. Everyone is invited to breakfast at 7:45/8:00am at IHOP.
Ride will be north on Alabama st/west lugonia/hwy38/hwy18 to Big Bear city. Then hwy18/hwy138 to Cajon Junction. Then hwy138/Lone Pine Canyon Rd/hwy2 to Wrightwood for Lunch(Grizzly Cafe 1455 St. Hwy 2 Wrightwood, CA 92397). Then hwy2/Big Pines Hwy/Fort Tejon Rd/Mt. Emma Rd/Angeles Forrest Hwy/Angeles Crest Hwy to Flintridge.
Ride length from Redlands to Flintridge --- 196miles.
Estimated TIME with breaks and lunch --- 5 3/4hrs or 2:45pm.
For those in the Long Beach area;
Ride length from 91/605 interchange back to 91/605 interchange --- 296miles.
Estimated TIME with breaks, lunch, & breakfast --- 8 1/2hrs or 3:30pm.
Estimated Timetable;
Around 7am, leave Long Beach Area for Redlands.
8am-9am, breakfast and ride meet.
9am-12:15pm, on the road.
12:15-1:15pm, lunch at Wrightwood.
1:15pm-2:45pm, on the road to Flintridge.
2:45-3:30pm, on the road back to Long Beach Area.
Gas is no problem this ride, and once again the times are estimated. It's a group ride, so it could be faster or it could be slower.
There are 2 map pics.
<!--EDIT|Charlesbusa
Reason for Edit: None given...|1148011454 -->